Qaran Innovative Technology
image
Service 01

NETWORK DEVELOPMENT

  • Local Area Network
  • Wide Area Network
  • PTP
  • PTMP
  • Microwave
  • VSAT Installation
  • BTS

image
Service 02

DATABASE DEVELOPMENT

  •  Database Design
  • Database Development
  • Database Integration
  • Database Performance Tuning
  • Data Warehouse
  • Database Analysis & Reporting
  • Data Security
  • Database Migration

image
Service 03

SOFTWARE DEVELOPING

  •  Black box and White box Test
  • Integration Test
  • Regression Test
  • Performance Test
  • Compatibility Test
  • Data and UI Security Test
  • Load Test

image
Service 04

SMART URBAN MANAGE

  • Traffic Camera
  • Premises Lighting
  • Access Controls

image
Service 05

TECH CONSULTANCY

  • Consultancy Areas
  • Enterprise Solutions
  • Application Development Services
  • Mobile Development Services
  • Software Application Testing Service
  • Technical  and ManagementTraining
  • Project Management

image
Service 06

IT TRAINING

  • Training Areas
  • Net Programming
  • Java Programming
  • Database
  • Software Quality Assurance
  • Project Management
  • CAD
  • SAP

image
Service 04

TRAFFIC MGMT

  • Smart City Management
  • Installing Traffic Camera
  • Smart Lighting
  • Transport Management

image
Service 05

FIBER OPTIC

  • FTTH Fiber to the Home
  • Premises Cabling
  • Outside Plant
  • Network Design
  • Splicing and Termination
  • Fiber to the Wireless
  • Testing +OTDR

image
Service 06

REPORTING

  • iReport
  • CrystalReport
  • Microsoft ReportingServer
  • Microsoft Clientreports
  • HTML5
  • CharJs, Google Chart,Flot

---------------------

HOW WE WORK

01

PRODUCT BACKLOG CREATION

Before any project work begins. we need to create a product backlog. It replaces the traditional requirements specification artifacts. This is essentially a list of the goals that need to be achieved in order to create a finished product. These are the
list of epic or stories listed in order of priority. We conduct backlog refinement sessions to ensure that it contains the appropriate items, are prioritized, and that the items at the top are ready for delivery.

02

SPRINT PLANNING SPRINT BACKLOG CREATION

Sprint is an iteration, a time boxed effort in which we produce a specified working software. During a sprint
planning session, we set a sprint goal and create a sprint backlog from the product backlog. Sprint planning is a collaborative effort involving the Development Team, Scrum Master and the Product Owner to clarify the de
tails of the user stories and their re
spective acceptance criteria.

03

SPRINT PLANNING TASKS DENOMINATION

In the second part of Sprint planning session we break down the stories in sprint backlog into tasks which can be tracked easily. The tasks are then checked for dependencies and the required time is estimated. We may also update the sprint back- log as more details are visible at this point. After that, we update the scrum board with stories in story to do section and tasks in the task to do section. The scrum board is used and updated during the whole sprint.

04

WORKING ON THE SPRINT

This is time where the actual coding,testing, UI designing, technical write ups etc. are performed. We stand for 5-minutes daily scrum meetings to sync everyone with the latest development, improve communications, eliminate other meetings and identify impediments to development for removal, highlight and promote quick decision-making. We track our development work in the sprint board, remaining hours are plotted in a burn down chart.

05

TESTING AND DEBUGGING

This is not a separate phase at the end of coding as done typically, rather it is done inside the sprint. When the stories are ready for review,
they are tested according to the acceptance criteria of the stories. The bug is fixed and retested if required. We perform the Integration
and regres-sion testing when all stories in the sprint are done. It ensure that the de-liverable or increment is in working condition andready.

06

SPRINT REVIEW, RETROSPECTIVE

At the end of the sprint, we hold a sprint review session where every one is involved. In the session, the work is demonstrated. We also plan
for any changes that need to be done according to feedback.
We hold a sprint retrospective session after the sprint is concluded to see what went well, what went wrong
and what can be improved in the process. It enables us to continuously evolve and improve.

200
Successful projects
120
Active Clients
25
Team Members
200
Upcoming Projects